58717a70c5
- Context: With shell transitions, the launch of a new task is merged into the same recents transition that is running, which means that it does not run as its own independent transition (this probably needs to be addressed in the transitions level somehow) - Given the above, if there is somehow no running task id, then we still need to rely on the next task appeared to trigger the flush of the callback list (since the animation will not run to flush that callback) Bug: b/255851262 Test: Manually simulate getRunningTaskViewId() == 1 and verify Change-Id: I778f22fa59cb1620781f7aa442d244793352d74e Signed-off-by: Winson Chung <winsonc@google.com>